6th ESLS-RF Meeting 2002 PSI Villigen, Switzerland
28th and 29th November 2002
ᅵ
7th ESLS RF Meeting will be organized at ANKA
Coordinator: Francis Perez ᅵ(francis.perez@iss.fzk.de)
PROCEEDINGS ᅵ(pdf format)
1st Session: Future Projects
Chairman: M. SvandrlikChairman Summary |
M. Svandrlik |
Status of the SOLEIL RF system |
P. Marchand |
Test of the SC SOLEIL cavity prototype at the ESRF |
J. Jacob |
Diamond RF status |
M. Dykes |
Diamond booster R F system |
A. Moos |
Status of the ELETTRA RF system upgrade project |
A. Fabris |
2nd Session: Power Sources
Chairman:W. AndersChairman Summary |
W. Anders ᅵ ᅵ ᅵ ᅵ |
Low cost 200 kW CW 352 MHz MOSFET Amplifier Design |
T. Ruan |
SOLEIL Booster RF |
J. Pollian |
Supervision and Power Supply for High power Solid State Amplifier |
F. Riberio |
Power sourced, what next? Discussion on possible common strategies |
W. Tron |
related topic: EEV presentation given at Bessy |
|
related topic: mail exchange on high power combiner (tanks to Christopher) |
C. Gough |
3rd Session: Landau Cavities
Chairman:P. MarchandChairman Summary |
P. Marchand ᅵ ᅵ ᅵ |
SLS-S3HC cryogenic system commissioning |
A. Anghel |
SLS-S3HC first cold operation ï¿œfirst cold operation |
M. Pedrozzi |
Longitudinal Beam Dynamics with Harmonic RF systems |
V. Serriere |
ELETTRA S3HC installation and warm operation |
M. Svandrlik |
Status of BESSY II (Landau Cavities) |
W. Anders |
HOBICAT a Horizontal Testfacility for Superconducting Cavities at BESSY. |
W. Anders |
7th ESLS RF Meeting will be organized at ANKA
Coordinator: Francis Perez ᅵ(francis.perez@iss.fzk.de)